Sonowal Approves ₹472 Crore ROB Project at Tuna-Tekra to Boost Port Connectivity

Sonowal Approves ₹472 Crore ROB Project at Tuna-Tekra to Boost Port Connectivity

Summary

Sarbananda Sonowal has approved a ₹472 crore Road Over Bridge (ROB) and associated road works at Tuna-Tekra to strengthen port connectivity and speed up cargo evacuation. The civil works cover viaducts, a bridge across a creek and supporting infrastructure, backed by a 10-year maintenance plan to ensure durability and performance. The Delegated Investment Board reviewed the proposal and the project is being coordinated with the Tuna-Tekra container terminal schedule (currently around 45% physically complete).

Key Points

  1. Central approval given for a ₹472 crore ROB and road infrastructure at Tuna-Tekra to improve port access.
  2. Works include viaducts, a creek bridge and ancillary infrastructure, plus a 10-year maintenance programme.
  3. The ROB is intended to be the primary land link for the Tuna-Tekra Mega Container Terminal (planned 2.19 million TEU capacity) and a multipurpose berth (18.33 MMTPA).
  4. Project aims to reduce vessel turnaround and streamline cargo movement by easing road and rail bottlenecks for heavy cargo evacuation.
  5. The proposal was reviewed by the Delegated Investment Board chaired by the Ministry of Ports, Shipping and Waterways’ Secretary.
  6. Execution will be synchronised with the container terminal’s commissioning to optimise operational benefits.
  7. The development aligns with national maritime strategies including Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047.

Author style

Punchy: This is a big-ticket, no-nonsense infrastructure move for port logistics. If you work in shipping, terminal operations or freight, the details matter — this bridge changes the playbook for cargo flow at Tuna-Tekra.

Context & Relevance

The ROB sits at the heart of a wider push to scale India’s port capacity and cut logistics friction. Tuna-Tekra is being developed as a major container and multipurpose hub; adding dedicated road infrastructure mitigates land-side bottlenecks that often negate gains on the maritime side. For operators, shippers and planners, the project signals continued government emphasis on integrated port-led development and faster cargo evacuation — key to improving supply-chain velocity and reducing costs.

Why should I read this?

Quick and simple: if your business touches ports, container terminals or heavy cargo movement — this matters. The bridge will speed up truck turns, ease rail/road pinch points and unlock capacity at a terminal that’s being built to handle millions of TEUs. Worth a skim if you’re curious; worth a proper read if you move or handle containerised cargo.

Source

Source: https://www.logisticsinsider.in/sonowal-approves-%E2%82%B9472-crore-rob-project-at-tuna-tekra-to-boost-port-connectivity/