Map and improve core operational processes to reduce costs, errors and inefficiency across land-based casino operations.
Operational Process Mapping & Improvement Framework
Map your core processes and cut the cost, errors and waste hiding in them.
When to use it
“I've been asked to take cost and errors out of our operational processes and show that the changes worked.”
Improvement work often fixes the documented process rather than the one staff actually follow, and without a baseline nobody can show the change delivered anything. The framework starts with an inventory of ten common gambling operator processes, from KYC and withdrawals to bonus fulfilment and regulatory reporting, to pick the few worth reviewing. It then maps each step as it really happens, records cycle time, error and rework rates and cost per transaction, and carries the findings into a future state design, a benefits estimate and a three-month tracker against the baseline.
What's inside
- Part 1: Process Inventory and Prioritisation Ten pre-filled processes, including customer onboarding and KYC, deposits, withdrawals, complaints, safer gambling reviews, bonus fulfilment, game releases, supplier invoices, rotas and regulatory reporting, each rated for volume, complexity and priority for review.
- Part 2: Current State Mapping and Measurement A step-by-step map for each process recording who does each step, the system used, time taken and pain points, and a baseline of cycle time, error rate, rework rate, cost per transaction and monthly volume.
- Part 3: Waste and Error Analysis Eight waste types, such as rework, waiting, duplication, manual workarounds and unclear handoffs, rated by frequency and impact, and an error and exception log with root cause, current control and recommended fix.
- Part 4: Future State Design and Benefit Quantification The future state for each process with the change required, and a benefits tracker estimating annual saving and hours saved, with a confidence rating and stated assumptions.
- Part 5: Implementation Plan and Performance Tracking A costed, prioritised action plan with owners and dates, and a tracker comparing cycle time, error rate, rework rate and cost per transaction with the baseline for three months after the change.
- Editable Word document (.docx)
- Five parts of tables; the step map is copied once per process
- Ten common gambling operator processes and eight waste types pre-filled
- No formulas or benchmarks: savings and totals are worked out by hand
- Suggests reviewing three to five processes at a time
What you'll have at the end
A prioritised process inventory, measured current-state maps with a baseline, a log of waste and root causes, a costed future state with an estimated benefit, and a three-month tracker showing whether each change delivered.
Who uses it
- Continuous Improvement or Operational Excellence Manager Selects the processes, runs the mapping and measurement, and writes the future state and benefits case.
- Process owners and team leaders Walk through how each process actually runs and test the future state design before it is approved.
- Finance Business Partner Checks the cost per transaction figures and the savings assumptions in the benefits tracker.
- Chief Operating Officer Approves the implementation plan and holds the team to the three-month performance tracker.
Regulations and jurisdictions
The framework cites no regulator or regulation and applies to online and land-based operators. It notes that process changes needing regulatory approval or system development will take longer to deliver.
Questions
What format is it and can it be edited?
It is an editable Word document. The process inventory and waste types are pre-filled and can be renamed, and the step map table is copied for each process you review.
How many processes should I review at once?
The framework suggests three to five, chosen by combining monthly volume, error or rework rate and cost per transaction rather than picking the process causing the most noise.
What data do I need?
Monthly volumes, end-to-end cycle times, error and rework rates and an estimated cost per transaction for each selected process. Sampled estimates are acceptable if they are marked as estimates.
Does it include benchmarks?
No. Performance is measured against your own baseline before and after the change, not against industry figures.
Is it included in the All Access Pass?
Yes, it is included in the All Access Pass. It can also be bought individually for £499 + VAT.
All Access Pass
Everything you need. One annual pass.
- All 115 tools and frameworks — unlimited access
- Full monthly vertical updates across all 6 verticals
- Full monthly Board Briefing
- 7-day grace period on renewal
Annual. Manual renewal. Cancel any time — purchased tools are yours forever.